# Three-Point Estimate

> An estimate made from three guesses. They are the best case, the most likely and the worst.

**Field:** Business & Startups  
**Category:** Scope, Schedule & Cost  
**Also known as:** PERT Estimate, Three-Point Estimating

## Think of it like

It is like guessing your walk to school. On a good day it takes 10 minutes, on a bad day 20, and most days 12.

## Definition

A three-point estimate uses three guesses instead of one. The first is the best case, the second is the most likely and the third is the worst case. These are then blended into one number. The common blend gives the most likely guess four times the weight of the others. The gap between best and worst also shows how unsure the guess is.

## Formula

```
Estimate = (O + 4M + P) / 6, where O is the best case, M the most likely and P the worst case
```

## Example

A task could take 4 days at best, 6 most likely or 14 at worst. The blend gives (4 + 24 + 14) / 6 = 7 days.

## Why it matters

One number hides the risk. Three numbers show it, and a long worst case pulls the answer up.

## Common mistake

Picking a worst case that is still hopeful. The worst case should be truly bad, but possible.

## Three principles

- **Three guesses.** Best, most likely and worst.
- **Weighted.** The most likely counts four times.
- **Shows doubt.** A wide gap means high risk.

## Related terms

- [Project Estimate](https://learn.benibix.com/term/business/project-estimate)
- [Bottom-Up Estimating](https://learn.benibix.com/term/business/bottom-up-estimating)
- [Analogous Estimating](https://learn.benibix.com/term/business/analogous-estimating)
- [Critical Path Method (CPM)](https://learn.benibix.com/term/business/critical-path-method)
- [Project Risk](https://learn.benibix.com/term/business/project-risk)

## Told apart from

- [Three-Point Estimate vs PERT](https://learn.benibix.com/compare/three-point-estimate-vs-pert): People think a three-point estimate and PERT are the same thing. A three-point estimate blends three guesses for one task. PERT is a whole way to plan the dates, built on one blend of those guesses. You can use the first without the second.

![A curve over a line of days rises fast to a peak at 6 days and trails off slowly to 14. Marks show the best case at 4, the most likely at 6 and the worst case at 14. An accent line at 7 marks the blended estimate, a little to the right of the peak.](https://learn.benibix.com/diagrams/pm-three-point.svg)

---

Source: https://learn.benibix.com/term/business/three-point-estimate
Author: Behnia Zarei (a developer in Vienna, Austria, who builds and teaches data, AI and business intelligence at BENIBIX)
Publisher: BENIBIX Learn (https://learn.benibix.com/)
Last updated: 2026-11-19
Licence: CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). Quote freely with attribution.