# Site Reliability Engineering (SRE)

> Running live systems the way you build code. Set goals, and let code do the dull work.

**Field:** Infrastructure  
**Category:** Reliability  
**Also known as:** SRE, Site Reliability Engineer, Reliability Engineering

## Think of it like

It is like a pit crew that also builds better cars. They fix things fast, then make them break less.

## Definition

Site reliability engineering is a way of running live systems with the tools of software work. An SRE writes code to do the jobs people used to do by hand. The team agrees on how reliable a service must be, and measures it. Time spent on manual work is kept low, so there is time to fix root causes.

## Example

At Google, SRE teams cap hand-done work, like tickets and on-call duty, at half their time. The rest goes to code that makes the service more reliable.

## Why it matters

It turns reliability from a feeling into a number. Teams then argue less and fix the right things.

## Common mistake

Giving the old ops team a new name and changing nothing else. With no targets and no time to automate, it is the same job.

## Three principles

- **Measure it.** Reliability has a target and a number.
- **Automate toil.** Repeated hand work becomes code.
- **Share the risk.** Speed and safety are balanced with a budget.

## Related terms

- [Service Level Objective (SLO)](https://learn.benibix.com/term/infrastructure/service-level-objective)
- [Error Budget](https://learn.benibix.com/term/infrastructure/error-budget)
- [On-Call](https://learn.benibix.com/term/infrastructure/on-call)
- [Postmortem](https://learn.benibix.com/term/infrastructure/postmortem)
- [DevOps](https://learn.benibix.com/term/development/devops)
- [Monitoring](https://learn.benibix.com/term/infrastructure/monitoring)
- [Four Golden Signals](https://learn.benibix.com/term/infrastructure/four-golden-signals)

![A bar from 99.8% to 100% availability. A marker shows the measured SLI at 99.97%. A line to its left marks the SLO at 99.95%, the team's own goal. A line further left marks the SLA at 99.9%, the promise in the contract. The part of the bar between the SLO and the measured value is shaded as budget left, and the part above the measured value as budget spent.](https://learn.benibix.com/diagrams/inf-sli-slo-sla.svg)

---

Source: https://learn.benibix.com/term/infrastructure/site-reliability-engineering
Author: Behnia Zarei (a developer in Vienna, Austria, who builds and teaches data, AI and business intelligence at BENIBIX)
Publisher: BENIBIX Learn (https://learn.benibix.com/)
Last updated: 2026-11-19
Licence: CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). Quote freely with attribution.
