PDCA vs DMAIC
People think these are two rival ways to improve, and they are not. PDCA is a quick loop for testing one small change, again and again. DMAIC is a longer project with five steps, for one stubborn problem that needs data to crack. Use the loop for small fixes, and the five steps when the cause is unknown.
Plan-Do-Check-Act (PDCA)
A four-step loop: plan, do, check, act. Then go round again.
Plan-Do-Check-Act, or PDCA, is a four-step loop for testing a change and learning from it. Plan the change and say what you expect. Do it on a small scale. Check the results against what you expected. Act by keeping the change, or by adjusting it and going round again.
DMAIC Method
The five steps Six Sigma teams use to find and fix the cause of a problem.
DMAIC is the five-step method Six Sigma teams use to fix a process. Define the problem and the goal. Measure how the process does today. Analyze the data to find the root cause. Improve the process to remove it. Control the new way so the gains stay.
In one line
- Plan-Do-Check-Act (PDCA)
- A four-step loop: plan, do, check, act. Then go round again.
- DMAIC Method
- The five steps Six Sigma teams use to find and fix the cause of a problem.