📋Burndown Chart
Also known as Burn-Down Chart, Sprint Burndown
A chart of work left over time. It should slope down to zero by the end.
Think of it like
It is like a candle burning down through the evening. You can see how much is left and guess when it will run out.
Example
Lucy's sprint starts with 40 points. On day 6 the chart shows 24 points left, above the ideal line at 16, so the team talks it through at the daily scrum.
Why it matters
It shows trouble early, while there is still time to act. A flat line for days means the team is stuck.
Definition
Common mistake
Key takeaways
- 1Work left over time. Points left up the side, days along the bottom.
- 2Ideal line as a guide. Above it means behind, below means ahead.
- 3Flat means stuck. No drop for days needs a talk.