Bottom-Up Estimating

Business📅 Scope, Schedule & CostProject Schedule

Also known as Bottom-Up Estimate

Estimate each small piece of work. Then add them all up for the total.

Think of it like

It is like adding up the price of each thing in your shopping basket. The total is the sum of the parts.

Example

Emma prices all 48 work packages in a shop fit-out. They add up to 212,000 dollars.

Why it matters

The people who do the work make the guesses, so the total rests on real detail.

Definition

Bottom-up estimating builds an estimate from the smallest pieces of work. Each work package gets its own estimate, often from the person who will do it. The estimates are then added up, level by level, to a total for the whole project. It is slow, but it is the most exact way. It needs a finished work breakdown structure first.
Bottom-up is the middle panel. Small pieces are priced one by one, then added up.

Common mistake

Forgetting work that sits between the pieces, like testing and handover. The sum then comes out too low.

Key takeaways

  1. 1
    Small first. Estimate the work packages.
  2. 2
    Add up. Roll the numbers up to the top.
  3. 3
    Slow but sharp. It takes time, and it is the most exact.